Bent flanges so they were all 90deg to the web of each of the 14 ribs:
Fluted the upper and lower flanges of all ribs; deburred edges and lightening holes:
#40 dimpled lower flanges of all ribs:
Torque tube support bracket assembly (final drilling rib web):
Another view:
Removed 11 sets of bolts in the spar (to eventually match-drill holes into the front flanges of the 11 inboard-most ribs):
Clecoed flap bracket assemblies:
The 11 sets of bolts, washers, and nuts:
Clecoed all 14 ribs to main spar to match-drill bolt holes, match-drill front flange #30 holes, and match-drill #40 holes in spar flange to upper and lower flanges of ribs:
Another view:
I must have liked this part, since the structure is starting to look like a piece of the left wing:
Primed the flap hinge brackets, and riveted to flap hinge rib and the main ribs:
Torque tube support bracket assembly, riveted:
... and attached to the W-1010-R inboard-most rib
Bolted and torqued (~47in-lbs) bolts to ribs; clecoed rib front flanges to main spar web:
Riveted front flanges of ribs to main spar web:
Another view:
Riveted 7 forward-most #40 holes in main spar flange to inboard ribs #2-#8 (top and bottom) - this portion will be where the fuel tanks attach, using the adjacent nutplates:
No comments:
Post a Comment